Red-iron and bolt-up kits, erected to the drawings

Bought a metal building kit and need a crew to stand it? Or want one contractor to source, foundation, and erect the whole thing? Revolve Construction erects pre-engineered steel buildings across the St. Louis metro and Southern Illinois — foundations and anchor bolts set to the manufacturer's template, frames plumbed and torqued, panels and trim installed to the erection drawings.

Get Your Free Roofing Estimate

As soon as you contact our expert team, this will be the only form you have to fill in!

Active leak or storm emergency? Skip the form — call (314) 400-8006, answered 24/7.

Takes 30 seconds · No obligation · We never share your info

Why homeowners and businesses trust Revolve

  • Anchor bolts set right the first time

    The single most expensive mistake on a steel building is a foundation that doesn't match the template. We pour the foundation ourselves, off the manufacturer's anchor-bolt plan, and verify diagonals before the concrete goes off.

  • Erected to the manufacturer's spec

    Torqued connections, correct bracing sequence, proper purlin and girt spacing, and panel fastening to the published pattern — the things a building's warranty actually depends on.

  • Commercial-grade project management

    We already run commercial roofing projects for cities, schools, churches, and developers. Same permitting, inspection, and scheduling discipline applies to your building.

What we offer

  • Erection-Only Contracts

    You supply the kit, we supply the crew, cranes, and lift equipment to stand it and sheet it.

  • Turnkey Design-Build

    We handle building selection, foundation design, permits, erection, and finish-out on one contract.

  • Foundations & Anchor Bolts

    Footings, piers, grade beams, and slabs poured to the manufacturer's anchor-bolt template with verified layout.

  • Commercial & Industrial Shells

    Warehouses, shops, contractor yards, self-storage, and light-industrial buildings.

  • Insulation Systems

    Banded blanket systems, liner, and spray foam specified for conditioned or semi-conditioned space.

  • Metal Building Re-Skins & Repair

    Wall and roof panel replacement, fastener retrofit, and re-trim on aging steel buildings.

Erection Is a Precision Trade, Not a Muscle Trade

A pre-engineered metal building arrives as a numbered pile of red-iron frames, girts, purlins, bracing, fasteners, panels, and trim, with an erection drawing set that specifies exactly where each piece goes and how tight each connection has to be. Done right, the building goes up square, plumb, and true, and the panels lay down flat. Done wrong, frames rack, panel ribs walk out of alignment across a wall, and doors never quite close.

Revolve Construction erects steel buildings to the manufacturer's drawings: frames set and plumbed before bracing is tensioned, connections torqued to spec, purlins and girts spaced as drawn rather than as convenient, and panels fastened to the published pattern. We carry the lift equipment and rigging to do it safely and the commercial project management to do it on a schedule that other trades can plan around.

The Foundation and the Anchor Bolts Are the Whole Ballgame

The most expensive mistake in metal building construction is a foundation that does not match the building. Anchor bolts a half-inch out of position, a pier at the wrong elevation, or diagonals that are out of square turn a two-day frame erection into a week of field modification — and field-modifying red iron can void the manufacturer's warranty.

We pour our own foundations off the manufacturer's anchor-bolt plan, using templates rather than tape measures, and we verify diagonals and elevations before the concrete sets rather than after. Footings, piers, and grade beams get sized to the reactions on the drawings, which is a different calculation from a residential slab and one that plenty of general concrete contractors do not run.

If you have already contracted the foundation elsewhere, we will still erect the building — we will just want to check the as-built layout against the template before the crane shows up.

Commercial Buildings Need Commercial Process

Steel buildings tend to be commercial projects, and commercial projects run on paperwork as much as on steel: bid packages, submittals, certificates of insurance, permit sets, inspection scheduling, and coordination with civil, electrical, mechanical, and fire-protection trades. Revolve Construction already delivers commercial roofing projects for cities, schools, churches, and developers across the St. Louis region, so that machinery is already built.

We can take the project at whatever depth you need — erection-only for a kit you have already purchased, foundation plus erection, or full design-build where we help select the manufacturer and building configuration, handle permitting, pour the foundation, erect, sheet, and finish out with doors, insulation, gutters, and interior liner.

Frequently Asked Questions

1. Will you erect a steel building kit I already ordered?
Yes. Erection-only is a standard contract for us. Send the erection drawings and anchor-bolt plan and we will quote crew, equipment, and schedule. We can also pour the foundation to the manufacturer's template as a separate line item if that has not been contracted yet.
2. How much does it cost to erect a metal building?
In the St. Louis market, erection-only labor on a pre-engineered steel building typically runs $8 to $16 per square foot depending on eave height, complexity, crane access, and how much trim and door work is included. Turnkey — building, foundation, erection, and finish — generally runs $45 to $80 per square foot for commercial shells. We quote line-item so you can see exactly what is included.
3. What foundation does a steel building need?
Pre-engineered steel buildings transfer large concentrated loads at each column, so they need footings, piers, or grade beams sized to the column and base-plate reactions shown on the manufacturer's drawings, with anchor bolts set to the template. A plain residential-thickness slab is not adequate. We design and pour to the drawings.
4. How long does steel building erection take?
A typical 5,000 to 10,000 square foot single-story building takes roughly two to four weeks to erect and sheet once the foundation has cured, weather permitting. Foundation work and permitting usually add four to eight weeks ahead of that.
5. Can you insulate a steel building?
Yes. We install banded blanket systems, liner panel, and closed-cell spray foam depending on whether the building will be conditioned, semi-conditioned, or simply protected against condensation. For any building that will be heated in a St. Louis winter, condensation control is not optional — bare panels will sweat and drip.
6. Do you handle permits and inspections for commercial buildings?
Yes. We pull permits, coordinate stamped engineering, schedule inspections, and provide the submittals, COIs, and documentation that municipalities, GCs, and property owners require. Call (314) 400-8006 or email Sales@Revolve.Construction to start a bid package.